3 ms·
The overheating datacenter didn't stop the transactions. It was the technical inability of the banks to fail over which should have been seamless. Outages hap
by psychlops 3y ago
The overheating datacenter didn't stop the transactions. It was the technical inability of the banks to fail over which should have been seamless.
Outages happen.
- jimt1234 3y agoIMHO, "fail over" will always fail. Any multi-data-center architecture should actively utilize all data centers, all the time, maybe dedicate more traffic to one or the other. But, if you've got a "passive" data center that you wanna activate during an outage, you're gonna have a bad day. Every time.
- ms_frizzle 3y agoMy experience contradicts your hyperbole. Over the past two decades I've been part of several fail overs with active/passive and build from scratch DR solutions. Most succeeded. The ones that didn't succeed on the first attempt did so on the second one. Not a perfect track record, but it does happen with proper documentation, testing, and skilled staff to handle it.