3 ms·
On this job. Pretty much read the instructions and off to the races. The GC that hired me stuck around for a week or so to make sure everything was going smoo
by tastyfreeze 3y ago
On this job. Pretty much read the instructions and off to the races. The GC that hired me stuck around for a week or so to make sure everything was going smooth then he was off keeping the supplies flowing and would just check in every few days. The ease of building with ICF is a huge draw. It takes zero experience with concrete or building forms.
- tomcam 3y agoLearning something new every day. Thanks much for this.