3 ms·
NASA saying there is a “research gap” and that it “needs mitigation” is very different from it being an “unacceptable risk” which implies that no mission can ha
by ghufran_syed 3y ago
NASA saying there is a “research gap” and that it “needs mitigation” is very different from it being an “unacceptable risk” which implies that no mission can happen until it happens. if there was a ship ready to go with a hab and propellant for the return trip sitting on mars, I can guarantee they would take the very next transfer window, kidney stone risk notwithstanding- particularly if the chinese or russians were about to do so and might get there first!
- hypercube33 3y agoI mean I just watched a bunch of documentaries about Challenger and Columbia...you're damn right they would rubber stamp it.
- bumby 3y agoWhat’s your definition of rubber stamping? Usually it means approving without any consideration. In both of those cases, there was a lot of deliberation. Their end conclusion may have been wrong, but it’s really quite different than “rubber stamping”
- bumby 3y agoAccording to the method by which NASA measures risk, it is indeed an "unacceptable risk". The red 4x4 "LxC" box stands for "likelihood x consequence". So they consider it a high likelihood and a severe consequence. It's red because that puts it in the unacceptable category. If you look at the medical risk matrix it puts the likelihood between 60% - 80% and consequence at "loss time injury or illness per OSHA criteria" On a score of 1 (least risky) to 25 (most risky), a 4x4 scores 22. Now to your point about "guaranteeing" they would still go, they are allowed to waive these risks through a formal process. It tends to make managers squeamish though, because nobody wants to be the person who's signature is attached to a known risk that eventually causes a mishap. https://www.nasa.gov/wp-content/uploads/2015/10/s3001_guidelines_for_risk_management_-_ver_g_-_10-25-2017.pdf https://www.nasa.gov/wp-content/uploads/2015/10/s3001_guidel...