4 ms·
Sometimes Scrum does get called "lots of very short waterfalls". It's not entirely wrong, in the current incarnation. [On edit, I see you've made this point be
by regularfry 3y ago
Sometimes Scrum does get called "lots of very short waterfalls". It's not entirely wrong, in the current incarnation. [On edit, I see you've made this point below. Yes.]
Note that until relatively recently (2020, I think), the Scrum Guide referred not to "commitments" but to "forecasts". That was a much better framing, and I don't know why they changed it.