Even a Carrington-level event, which refers to a solar coronal mass ejection (CME) observed in 1859, is indeed a concern for modern electrical infrastructure. D
by keepamovin 3y ago
Even a Carrington-level event, which refers to a solar coronal mass ejection (CME) observed in 1859, is indeed a concern for modern electrical infrastructure. During such an event, geomagnetically induced currents (GICs) could flow through electrical grids, potentially overheating transformers and causing them to fail. These GICs are particularly harmful to transformers because they can lead to half-cycle saturation, increasing the reactive power demand and causing internal hotspots.
While transformers themselves may have low impedance, it’s the connectivity and expanse of the grid system that makes them vulnerable during geomagnetic disturbances. The longer the conductive path, the more susceptible the system is to GICs, regardless of the impedance characteristics of individual components like transformers.
An X500-level solar flare would be many times more powerful than the Carrington event and could wreak havoc on our electrical infrastructure. Given our increasing reliance on electricity for everything from communications to transportation, the societal impact would be significant.
Hence, the idea of a Strategic Transformer Reserve isn’t just about preparing for solar storms; it’s a multi-hazard approach that also considers other threats like cyber-attacks, terrorism, or even conventional warfare.
The key question remains: do the potential catastrophic consequences justify the financial and logistical costs of maintaining a transformer reserve? From a risk-assessment standpoint, considering the dire impacts of a severe solar event or other threats, investment in a transformer reserve could be seen as a rational and scientifically justified precaution.
Particularly when the lead time to manufacture such equipment is in the order of years. A grid outage of that duration would be biblically catastrophic: without electricity, we have no water, no gasoline, no communications. We’d survive, but the suffering is not something it seems wise to consider an acceptable cost. Especially at a time of enhanced geopolitical competition, the effect of a storm whose severest effects would likely be localized to the sun-facing hemisphere, seems important not to underestimate.
I think it would be great if, instead of countries merely having arms races, they had preparedness races. I guess for us ape-brained humans, tribalism feels more compelling than a threat you can’t bite the face off.
- dinkblam 3y ago> The key question remains: do the potential catastrophic consequences justify the financial and logistical costs of maintaining a transformer reserve? isn't this something that can be trivially answered with game theory? you just need the cost and the probability.
- deleted 3y ago[deleted]
- londons_explore 3y ago> geomagnetically induced currents (GICs) could flow through electrical grids, potentially overheating transformers and causing them to fail. yes, but such currents are typically measured in milliamps or, during the biggest storms, amps. Most utility scale transformers would be needing DC currents of the order of thousands or tens of thousands of amperes before failure. Even then, overheat sensors would detect such a condition, and operationally the circuit could be de-energised and connected to earth to protect it. Also, where there are perhaps thousands of transformers connected to a particular distribution grid, the load from the GIC's is shared amongst them, further reducing impact.
- chakalakasp 3y agoI dunno. The American Geophysical Union seemed to think it was a BFD in one of their conferences back in the 2000s. Had a whole presentation about how certain parts of the US grid would lose large transformers that would likely take months to years to replace as there are few spares and they have to be wound with miles and miles of copper by hand. Said that large swaths of the US would be without grid power for very long periods. Said that third world countries would fare pretty well though.
- shiroiuma 3y agoIt sounds like they need some type of automatic or robotic winding system... Even without some catastrophe, they surely have to make new transformers from time to time, and winding miles of copper by hand sounds ridiculously inefficient for a manufacturing process.
- keepamovin 3y agoHand winding allows for a high degree of precision and quality control that may be difficult to achieve with automated machinery, particularly for specialized or custom designs. Skilled technicians can closely monitor the process and make adjustments on the fly to ensure that the winding is as precise as possible. This is crucial for large transformers, where even minor imperfections can lead to inefficiencies, increased heat, or failure. Transformers for electrical grids can vary greatly in their specifications depending on a variety of factors, such as location, usage, and existing grid architecture. Customization is often necessary, and hand winding allows for this level of customization to meet specific criteria, including the number of windings, the type of core used, and other design elements. Copper wire is both flexible and delicate. It needs to be handled carefully to avoid nicks, kinks, or other imperfections that can compromise the transformer’s performance. Human technicians can adapt to the nuances of the material more effectively than machinery in some cases, ensuring that the wire is handled with care throughout the winding process.