3 ms·
fair enough, but I'd argue that p * (cost of theft via roll onto trailer) << $700 p = probability of roll onto trailer theft
by jgalt212 3y ago
fair enough, but I'd argue that
p * (cost of theft via roll onto trailer) << $700
p = probability of roll onto trailer theft