4 ms·
operational use, this was a specific problem, and it was imposing on mission success. those get fixed fast, even on manned aircraft platforms. (time more likel
by 9659 3y ago
operational use, this was a specific problem, and it was imposing on mission success. those get fixed fast, even on manned aircraft platforms. (time more likely in weeks, rather than days).
space-X hopefully did a risk review. what is the chance this "100 line fix" is going to break something else? what was the in lab coverage? can it be rolled back?
sometimes you say you want agility; but you would really prefer low risk of greater failure.