2 ms·
PERT is at its core a risk mitigation process. The node redundancy aspect allows culling unproductive teams, departments, and or entire divisions as needed. An
by Joel_Mckay 3y ago
PERT is at its core a risk mitigation process. The node redundancy aspect allows culling unproductive teams, departments, and or entire divisions as needed.
And yes, attempting to cost-optimize production of intangible assets is a fools errand. Things cost what they must relative to market conditions, and if something is indeed unfeasible.. no amount of marketing hype will change facts.
"TPS Reports" and the meeting with Bob:
https://www.youtube.com/watch?v=BTdOHBIppx8 https://www.youtube.com/watch?v=BTdOHBIppx8
=)