3 ms·
Fair point. FWIW from the same gov source "The blast furnace route forms the majority of UK and global steel production. In 2018, 82% of UK steel (5.9 million
by ricardo81 3y ago
Fair point.
FWIW from the same gov source
"The blast furnace route forms the majority of UK and global steel production. In
2018, 82% of UK steel (5.9 million tonnes) was produced using the blast furnace
route at Tata Steel’s Port Talbot site and British Steel’s Scunthorpe site. The
Government estimated that 95% of iron and steel industry emissions (and
around 15% of total industrial emissions) come from the Scunthorpe and Port
Talbot blast furnace sites."
It does not differentiate between the two, though.