In regards to California transmission, funding is always an issue when it comes to infra, but will is more important. They should be burying transmission lines
by toomuchtodo 3y ago
In regards to California transmission, funding is always an issue when it comes to infra, but will is more important. They should be burying transmission lines to reduce future fire risk, and burying avoids a lot of NIMBY and right of way issues. Conductor sizes for HVDC cables at 2GW is roughly 3"-5", with burial requiring a corridor that is only 5 feet wide and 5 feet deep. You'll pay more upfront, but TCO is lower when considering no need to power down lines during high winds, potential future litigation, and pulling forward the capability.
https://www.spglobal.com/marketintelligence/en/news-insights/latest-news-headlines/study-details-benefits-of-burying-hvdc-lines-along-existing-rights-of-way-69780258 https://www.spglobal.com/marketintelligence/en/news-insights... (Study details benefits of burying HVDC lines along existing rights of way)
> In contrast, the $2.5 billion SOO Green HVDC Link — a 350-mile underground transmission line expected to link the PJM Interconnection LLC and Midcontinent ISO wholesale power markets using an existing Canadian Pacific Railway right of way between northern Iowa and the Chicago area — has received far less pushback.
> That line likely would have cost around $1 billion if it was sited above ground, but it also would take about five years longer to build, Putnam said.
- konschubert 3y agoHow are the buried lines cooled?
- toomuchtodo 3y agoEither heat conduction to the ground or parallel coolant loops for higher temperature operations.