2 ms·
The Saturn V S-IC first stage generated 166 GW of power output, roughly equivalent to the electrical generation capacity of France at the time. Though that was
by dredmorbius 3y ago
The Saturn V S-IC first stage generated 166 GW of power output, roughly equivalent to the electrical generation capacity of France at the time. Though that was sustained for 168 seconds (2m48s).
Power output vs. time comparisons can be interesting. The Hiroshima "Little Boy" bomb output about 18 GWh worth of energy, in a few milliseconds. A large electrical generation plant of 1 GW capacity generates the same amount of electrical power in about 18 hours, and is releasing the thermal energy in about 2--3 hours at typical Carnot efficiencies.