3 ms·
Huh. On the 5 Euro bill, it takes three pillars of the middle layer to go from peak to peak along the bottom layer. Then, it takes four pillars of the top layer
by thaumasiotes 3y ago
Huh. On the 5 Euro bill, it takes three pillars of the middle layer to go from peak to peak along the bottom layer. Then, it takes four pillars of the top layer to go from peak to peak along the middle layer.
But the imitation bridge makes both ratios three.
- ajmurmann 3y agoThat bridge is really the worst implemented one. The middle layer on the imitation bridge also is filled in between the arches which IMO ruins the entire aqueduct look
- eastbound 3y agoProportions are off anyway. The cable bridge should be 500m to 1.5km. The plain stone one should be 40m to 80m. Those are minuature.
- layer8 3y agoMiniature doesn’t imply that proportions have to be off (as opposed to scale).
- thaumasiotes 3y agoI would be interested to know whether the cable-stayed bridge is putting any load on the cables, or if they're just an art object supported by the bridge.
- croisillon 3y agoi came to say that, the idea is good but the proportions (and the materials, probably?) are so off it ends up looking terrible
- ant6n 3y agoIt’s a neat project. But it does remind me a bit of that 18 inch (instead of feet) Stonehenge in Spinal Tap: https://m.youtube.com/watch?v=Pyh1Va_mYWI https://m.youtube.com/watch?v=Pyh1Va_mYWI