Critical path nerds will be looking at lengthening the truck queue. If you slip an extra truck into the rotation then there's a longer idle slot just before mo
by defrost 3y ago
Critical path nerds will be looking at lengthening the truck queue.
If you slip an extra truck into the rotation then there's a longer idle slot just before moving to the excvator - an opportunity to charge any difference lost on the round trip | regained on the descent to load out.
Cost to that is an extra truck - there's a few million.
Gains are longer idle time, less heat build on the tires, charging, reduced fuel costs with electric fleet.
There are many options to consider and cost.
The first draft of things like https://www.micromine.com/pitram/ https://www.micromine.com/pitram/ were written in the early 1980s.