3 ms·
From your own link: > Some lessons were however learned from conceptional mistakes made in its construction, e.g., the futility of trying to reach profitable i
by KennyBlanken 3y ago
From your own link:
> Some lessons were however learned from conceptional mistakes made in its construction, e.g., the futility of trying to reach profitable installation sizes without taking intermediate steps
> The point of view that multi-MW-yield wind turbines were technically and commercially infeasible gained some currency after the failure of the project, but was eventually superseded by technical progress. Beginning with the late 2000s, twenty-five years after Growian was decommissioned, installations with identical dimensions and yield (100 m rotor diameter, 3 MW net yield) were being produced in large numbers, a class of turbines that has continued to dominate the market and to push forward the mean net yield of newly installed turbines.
- ZeroGravitas 3y agoAnother interesting paragraph suggests this was designed to fail: > The partners as well as the BMFT also had political motives connected with the project. Günther Klätte, management board member of RWE, stated during a general business meeting: "We require Growian [in the general sense of large wind turbines] as a proof of failure of concept", and he noted that "the Growian is a kind of pedagogical tool to convert the anti-nuclear energy crowd to the true faith".[6] A similar statement regarding the incurred financial burdens was reported of Minister of Finance and former Minister of Research Hans Matthöfer: "We know it won't do anything for us. But we do it to demonstrate to the wind energy advocates that it doesn't work."[6] After the Green Party had derided the installation as the electricity provider's "fig leaf" on the occasion of groundbreaking in May 1981, the RWE took internal measures to make sure that publicly a position of open-mindedness towards alternative energy production was emphasized while public interest in wind energy was allayed.