3 ms·
> "FTA: they would involve placing aluminum AM-2 mats along a strip of highway, up to 1,500 feet long. This will be sufficient for the stealth jets to carry out
by tolien 3y ago
> "FTA: they would involve placing aluminum AM-2 mats along a strip of highway, up to 1,500 feet long. This will be sufficient for the stealth jets to carry out short takeoffs and vertical landings while protecting the road beneath them."
They did this before as part of an airshow demo. The Royal Engineers (Army co-operation!) had built pads at RAF Fairford for RIAT then the F-35B flew in, engaged STOVL mode (i.e. lift fan door open, rear engine nozzle pointed down etc.) and landed vertically on it then took off again.
Can't remember what year it was; Google suggests the MoD released PR saying they had done the same thing at Marham in 2018 but it's possible the demo was by a USMC F-35B.
- sillywalk 3y agoI'm curious how long it takes / how many people / what special equipment or vehicles were required to set up these types of semi-improvised runways.