14 ms·
$4,500 per charger+install isn't too bad, considering the material and labor costs.
by metadat 3y ago
$4,500 per charger+install isn't too bad, considering the material and labor costs.
- sokoloff 3y ago> require 26.8 million Level 1 and Level 2 ports at single-family homes, apartments and other locations That’s the counts for Level 1 and 2 chargers. Level 1 chargers are “a regular outlet and a $150 EVSE”. Level 2 is “a larger outlet/breaker and a $500-750 EVSE”. The projected $72B for that portion seems crazy high to me to be honest.
- metadat 3y agoThere could be additional electrical, cement, and other work required beyond just mounting the charger. Not to mention the planning and permit process. Also, labor is expensive these days. It's not going to be a single person doing the entire install alone. This is the standard quo in any first tier country today.
- sokoloff 3y agoBasically all the installs in single-family homes will be zero or one electrician. (Zero if the install is “plug in the L1 charger from Amazon to the existing outlet in the garage”) That will drag the average down quite a bit.
- metadat 3y agoThe downtown ones will easily soak up all excess resources allocated. :-/
- abracadaniel 3y agoA fraction of what it will cost to clean up all of the gas pumps slowly leeching into the soil.