Ya tech people that talk about this generally seem to have little knowledge of the field and think it's ripe for innovation, then later figure out it's not. If
by pixl97 3y ago
Ya tech people that talk about this generally seem to have little knowledge of the field and think it's ripe for innovation, then later figure out it's not.
If you think a house starts at the foundation, you've already missed half the battle. Lot subdivision is a massive amount of work and expense. You have utilizes and roads which in new construction takes around 2 years from concept to finish where I live.
Then when you lay a foundation and plumbing, which again takes a licened plumber to inspect before you put concrete on it. Then some time for concrete to set and dry before you can build on it.
Walls go up fast. Doesn't matter if it's wood, or where I live 3d printed concrete. What takes longer is services in the walls. Again plumbing, power, and possibly gas all requiring inspection. A builder inspector, city inspector, and many times the bank inspector will show up at this point. You still have a rough house that requires another month or two of finish work or more now.
Building off site and moving it in place has not worked well in practice, US new builds are typically huge. And even then moving finish work tends not to go well which requires massive amounts of time and labor to complete.