3 ms·
About 30% of interstate gas pipelines were built between 2007-2017 as one of the many consequences of the shale boom. Global LNG trade doubled in the same windo
by shawndrost 3y ago
About 30% of interstate gas pipelines were built between 2007-2017 as one of the many consequences of the shale boom. Global LNG trade doubled in the same window.
Germany installed 6 (floating) LNG import terminals in 2022.
California built five gas-fired power plants in a few months in 2021, after a blackout.
We can still build things fast when there is institutional will to do so.