This is interesting. As someone who works in this space (building hospitals) we see a lot of trending movement to the iPad, though I question the longevity of P
by samstave 15y ago
This is interesting. As someone who works in this space (building hospitals) we see a lot of trending movement to the iPad, though I question the longevity of PDFs.
We have a software suite for the construction industry, which has modules for inspection requests, punch-lists, occupancy planning (healthcare), room completion (healthcare), room readiness (healthcare) etc.
We also have a service around providing custom reports... however, we find that the need for dynamic data trumps the ability to simply view the latest plan digitally, i.e. we provide the ability to run a dynamic report on all inspections scheduled, performed, outstanding, etc... As well as the need to run a report that would "Show me all the rooms that have a Medication Dispensation Unit, on level two and assigned to unit Med Surge" - which outputs a colorized visio (or ZUI iPad floorplan).
The future is in granularity of reporting, rather than just blanket display, and I think this is a great step. Especially if you have many trades begining to use it. There is no reason the trades can't run multiple apps for specific purposes.
Although, I am not sure I agree with one number in the article; "For $1MM in construction, you can have as much as $3,500 in printing" -- I am only skeptical as I work on projects in the hundreds of millions (1.5B, 850MM, 800MM 100MM are the budgets for my (personally) active projects) I dont see them spending 3MM on printing for the 850MM project... but I might just not be privy to the numbers from every trade.
Here is an example of a dynamic room category report for an active project here in SF. We colorize the rooms based on type/use to familiarize the org with the spaces http://i.imgur.com/2DRah.jpg http://i.imgur.com/2DRah.jpg - We do a great deal more with the data and reports, this is just an example of many that the orgs use. Hospital transition planning is very complex, and costly. The vitals of the facility change a lot through the life of the project. The issue with educating THOUSANDS of people in prep for opening day such that they can SAFELY receive their first patient is critical.
Being able to very quickly synthesize and summarize vast amounts of information makes for a better, more successful project and a better, more educated and prepared staff.
Remember that while there are hundreds of people on a project team, there are thousands of people on the facility staff who are expected to move into the facility day-one and not cause fatal mistakes.
A project I am doing in Texas is 1.5MM square feet and dynamic, item-level granularity reporting is going to be key in the smooth success of the project.
I would love to see what PlanGrid can offer such large projects - and while I am a full proponent of the iPad in the field, in an industry where cost is king, I'd like to better understand how they convince construction companies of the ROI - esp. when tools and materials walk of the job all the time.
I think that Plangrid should talk to the designers (not just architects) as well; RTKL, Mazzetti, TEECOM, RLS, SMWM, SFM, etc...
If PlanGrid (love the name) wants to talk to me - my email is in my profile.
- rsuttongee 15y agoFor us, the ROI on any project - but particularly large projects - is pretty simple: An iPad ($800) plus 3 years of PlanGrid ($1500 for the big plan) is almost always cheaper than the initial half-size set of thousands of drawings (a hospital project Tracy was on spent $2700 per planholder set of 3000 sheets), but when you add in the printing cost of MEPF coordination drawings, fabrication drawings, point-load drawings, deck-insert drawings, seismic bracing drawings, P&ID drawings, submittal shop drawings and the constant deluge of change order and supplemental sheets it's a huge money saver. We are cheaper than just the printing costs alone, but our real value-add comes from the huge reduction in document control hours we bring. This, combined with our ability to mitigate the risk of building off outdated information, makes a huge win for almost every project if you do the math.
- samstave 15y agoI'd be interested to see what the differential between 2D and BIM projects is. Let me give you a concrete example; a hospital here in SF that is building a new facility has spent 30+ million dollars on coordination and constructability issues between all the trades. There was far less printing of plans than there was hours spent coordinating the BIM model for changes. Now, granted, this wasa project where there was an oversight in the design as it pertained to the owners intent and a number of critical technology spaces required were left out of the design. This resulted in many hours of coordination efforts from all the trades to get these spaces into the facility, but a fraction of this was in printing. If you can help with this problem, coordination, you have a much larger market. The current industry trend is to err on the side of digital design and coordination meetings with IPD models, and reduce printing and field interference issues. What might be an interesting opportunity for your service is to notify trades when changes occur that may affect them. THEN show them the new, updated PDF. I don't know how this would occur -- other than the pushing of a constructability log or something.... Also, it would make sense that your app is much more focused on a the smaller project (HUGE market) of residential, smaller commercial etc.. Trying to force yourselves into solving the issues of massive scale projects may be suicide.