not knowing exactly, but with an estimate of the software size. sure. how else do you reliably estimate the projects cost and schedule. "engineering" not "prog
by 9659 3y ago
not knowing exactly, but with an estimate of the software size.
sure. how else do you reliably estimate the projects cost and schedule.
"engineering" not "programming"
- heyoni 3y agoDifficulty of the problem you’re trying to solve. Just like it could take 5 hours to come up with 5 lines of code, it could also take 5 minutes to produce another 5 lines. All depends on how complicated the task is.
- 9659 3y agoyep. and when you need to write 300K SLOC, the average takes care of the outliers.
- conductr 3y agoInteresting. I can estimate time by gauging complexity but LOC (for me) is usually not exactly correlated to time or complexity