Yes, though it is not used much anymore, in Italy most contracts are 3 kW, a number have been upgraded to 4.5 kW or to 6 kW, but that's it. Due to the way cont
by jaclaz 3y ago
Yes, though it is not used much anymore, in Italy most contracts are 3 kW, a number have been upgraded to 4.5 kW or to 6 kW, but that's it.
Due to the way contracts are currently made, there is a fixed amount you pay for the availability of power (no matter if you use it or not) so everyone is on the lower possible amount.
There is also a (relative) complication for new houses or (important) renewals, the electrical system needs to be designed, and while for systems up to 6 kW it is enough that the design is made by the technical representative of the installer/electrician, for larger power a project is needed by a certified electrical engineer, which has a cost.
But as said the real issue is that the local infrastructure is simply not dimensioned for the large increments of power that are (or will be) required by the diffusion of heat pumps and induction stoves, let alone the recharging of EV's.
I believe that the medium voltage (in Italy it is usually @12,000 or @20,000 volts) distribution can be enough or can be upgraded relatively easily, the issue is with the low voltage (the 380-400V) distribution lines and the transformers/electrical cabins in cities.