4 ms·
No, TLDR is: changing regulation. > This can be traced to a constantly shifting regulatory environment, which has continuously changed plant design requirement
by zigzag312 3y ago
No, TLDR is: changing regulation.
> This can be traced to a constantly shifting regulatory environment, which has continuously changed plant design requirements, and added more and more safety features, which often were required to be implemented on plants under construction.
> By stabilizing regulations, making them clear, and making changes to them predictable, we can prevent cost overruns associated with expensive and time-consuming on-site rework.
- lamontcg 3y ago> Some experts think these QA/QC requirements and their downstream market effects are the prime reason for high nuclear construction costs And one example of intrinsic issues: > Meeting these requirements for a site-produced material is difficult. Nuclear concrete typically has multiple closely-spaced reinforcing bars that can be difficult to arrange properly (the Royal Academy of Engineer’s 30-page Guide to Nuclear Concrete mentions “congestion” 13 times). Concrete placement issues have plagued every recent nuclear project and are frequently the source of delays and cost overruns. Examples abound: a 6 month delay from incorrectly placed rebar on Vogtle 3 and 4 in Georgia, a 4 month delay on the VC Summer plants for similar reasons, and a 9-month delay from poor concrete composition at the Olkiluoto 3 in Finland. > The difficulty of meeting requirements, combined with the lack of construction expertise due to long periods without constructing new plants, means that any new construction inevitably struggles as the builders learn how to meet the high level of stringency required. Delays at Vogtle Units 3 and 4 were partially due to a contractor unprepared for the difficulty of nuclear construction. Similar issues seem to be responsible for delays and cost overruns on Flamanville in France and Olkiluoto in Finland. Some of the other QA/QC issues are likely due to over-regulation, but you're probably not going to find any person in a management position in overseeing these projects who would agree to reducing those regulations. Nobody wants to be the person making the call to "cut corners" which then creates an accident, and there's good money to be made in adhering to the regulations.
- zigzag312 3y agoYes, regulations makes construction expensive, but changing regulations makes it even more expensive. The author concludes that while stabilizing regulations would make construction cheaper, it still wouldn't be cheap. And to further reduce costs, we would need to find ways to apply economies of scale in the build process.