2 ms·
I the near future (20 years) with enough EVs we will have enough storage capacity (All cars in Germany EVs -> 2 days of electrical power storage capacity). Eve
by KingOfCoders 3y ago
I the near future (20 years) with enough EVs we will have enough storage capacity (All cars in Germany EVs -> 2 days of electrical power storage capacity).
Everyone here currently adds local solar panels (which dropped 50% in the last year). Battery packs being no option 4 years ago are now offered for 1kwh household solar panels and dropped in price too (but not 50% yet). We will get one next year to move generated energy into consumption times in the evening (we have no car).
(This is all private consumption of course not industrial power usage)
- unglaublich 3y agoIndustrial power usage should anyway be designed as a function of electricity cost. Old-school always-on use is just not cost efficient (and thus not future proof).
- pjc50 3y agoThere are certain use cases which kind of have to be always-on. Big freezers. Aluminium smelters. Venezuela's terribly administered grid shut down power to its aluminium industry. This cannot survive without power to keep the smelters warm; two hours was enough to destroy the industry. https://www.alcircle.com/news/blackout-in-venezuela-brings-down-the-curtain-on-venezuelan-aluminium-sector-with-the-closure-of-the-last-smelters-44439 https://www.alcircle.com/news/blackout-in-venezuela-brings-d...
- WJW 3y agoInterestingly both of the use cases you mentioned are quite amenable to demand response. Big freezers can be set to a few degrees cooler and be switched off during peak electricity demand. In [1] the researchers even call them "ideal candidates for implementing demand response strategies". For aluminium smelters, you are correct in that they can't be turned off entirely (the cryolite will solidify) but it is often possible to reduce energy demand significantly by stopping the electrolysis reaction but still heating the mixture to keep it molten. Then later, when peak demand has passed you can switch on the electrolysis process again. [1] https://www.osti.gov/servlets/purl/1237687 https://www.osti.gov/servlets/purl/1237687