2 ms·
Yep, load following designs cost more to build and operate, and operating at even lower capacity factor means fewer kWh/year to pay back those costs. The advant
by Retric 3y ago
Yep, load following designs cost more to build and operate, and operating at even lower capacity factor means fewer kWh/year to pay back those costs. The advantage is if your forced to curtail output less as you can more closely follow the demand curve, but that’s already a losing proposition without drastic decreases in power plant operating and construction costs.