3 ms·
Also pumped hydro, pumped thermal, and resistive thermal. Resistive thermal in sand at 1200 C is projected (based on lab estimates) to have a LCOS of ~$0.05/kW
by pfdietz 3y ago
Also pumped hydro, pumped thermal, and resistive thermal.
Resistive thermal in sand at 1200 C is projected (based on lab estimates) to have a LCOS of ~$0.05/kWh and a round trip efficiency of 53%.