2 ms·
The old scheme was variable rates on a fixed schedule. I'm talking about more flexible variable rates that correspond to actual conditions (both supply and dem
by pfdietz 3y ago
The old scheme was variable rates on a fixed schedule. I'm talking about more flexible variable rates that correspond to actual conditions (both supply and demand), adjusted at high cadence.