2 ms·
Here's a video of that operation.[1] Yes, they really did level the ballast by putting a spare railroad tie ahead of the wheels of the hopper car. This was befo
by Animats 3y ago
Here's a video of that operation.[1] Yes, they really did level the ballast by putting a spare railroad tie ahead of the wheels of the hopper car. This was before the upgrade to concrete ties.
[1] https://www.youtube.com/watch?v=UWvuYdVV5-Q https://www.youtube.com/watch?v=UWvuYdVV5-Q
- chiph 3y agoThat was 23 years ago, but still looks low-rent. Here's how Brightline & the Florida East Coast Railroad are doing it in Florida for their double-track (mostly) expansion to Orlando. https://www.youtube.com/watch?v=vINzBkK1d-k https://www.youtube.com/watch?v=vINzBkK1d-k Note that the ballast hoppers have a solar panel on them to charge a battery, which runs a motor to actuate the hopper doors. Much better than a couple of guys with a wrench.