3 ms·
They'll[1] usually follow[2] that with a machine that picks the rails and ties/sleepers up and lays it back down on top of the newly-dropped ballast. [1] For s
by AnimalMuppet 3y ago
They'll[1] usually follow[2] that with a machine that picks the rails and ties/sleepers up and lays it back down on top of the newly-dropped ballast.
[1] For some value of "they". I don't know if Caltrain does it that way; most mainline US railroads do.
[2] That is, within a few days. Not necessarily within the time of someone hanging around to watch.
- Animats 3y agoHere's a video of that operation.[1] Yes, they really did level the ballast by putting a spare railroad tie ahead of the wheels of the hopper car. This was before the upgrade to concrete ties. [1] https://www.youtube.com/watch?v=UWvuYdVV5-Q https://www.youtube.com/watch?v=UWvuYdVV5-Q
- chiph 3y agoThat was 23 years ago, but still looks low-rent. Here's how Brightline & the Florida East Coast Railroad are doing it in Florida for their double-track (mostly) expansion to Orlando. https://www.youtube.com/watch?v=vINzBkK1d-k https://www.youtube.com/watch?v=vINzBkK1d-k Note that the ballast hoppers have a solar panel on them to charge a battery, which runs a motor to actuate the hopper doors. Much better than a couple of guys with a wrench.