4 ms·
That's a quality job. I've been in a station when a Caltrain ballast replacement train came through. Caltrain just had a hopper car full of ballast rock dumping
by Animats 3y ago
That's a quality job. I've been in a station when a Caltrain ballast replacement train came through. Caltrain just had a hopper car full of ballast rock dumping on new rock. A railroad tie was being pushed by the wheels of the hopper car to smooth the ballast. I was amazed that didn't result in derailing the hopper car. It was really low rent. I assume they followed up with a ballast tamper at some point, but it wasn't part of the ballast dump train.
Caltrain outsources much of their maintenance of way work, and it shows.
- AnimalMuppet 3y agoThey'll[1] usually follow[2] that with a machine that picks the rails and ties/sleepers up and lays it back down on top of the newly-dropped ballast. [1] For some value of "they". I don't know if Caltrain does it that way; most mainline US railroads do. [2] That is, within a few days. Not necessarily within the time of someone hanging around to watch.
- Animats 3y agoHere's a video of that operation.[1] Yes, they really did level the ballast by putting a spare railroad tie ahead of the wheels of the hopper car. This was before the upgrade to concrete ties. [1] https://www.youtube.com/watch?v=UWvuYdVV5-Q https://www.youtube.com/watch?v=UWvuYdVV5-Q
- chiph 3y agoThat was 23 years ago, but still looks low-rent. Here's how Brightline & the Florida East Coast Railroad are doing it in Florida for their double-track (mostly) expansion to Orlando. https://www.youtube.com/watch?v=vINzBkK1d-k https://www.youtube.com/watch?v=vINzBkK1d-k Note that the ballast hoppers have a solar panel on them to charge a battery, which runs a motor to actuate the hopper doors. Much better than a couple of guys with a wrench.