Given the fixed costs are huge and the varriable ones tiny for nuclear, how does this make sense!?
by LatteLazy 3y ago
Given the fixed costs are huge and the varriable ones tiny for nuclear, how does this make sense!?
- sp332 3y agoIt's a 1.6 GW reactor. When electricity prices go negative, they stand to lose a lot of money in a short amount of time.
- LatteLazy 3y agoI think this misses that that is ALL the nuclear station would lose by remaining online. A comparable coal/gas etc station would lose the same amount PLUS the cost of the fuel. Also, a gas power station can be started right back up again within about 1h. It takes 12h to get a nuclear station back online (assuming no issues). So the moment they shut down they lose 12h+ of output. (I cannot find the actual cost. In Denmark prices fell to -41.37E / MWh last week, and on that basis, a 1.6GW station (at max capacity) would lose 66k Euros / h. How much does it cost to just keep the place shut?)
- eesmith 3y agoThe issue seems to be they can't shut down the hydro generation because of the flooding. While what you say about "coal/gas etc" is true, it's easier to reduce nuclear power generation than to lower the water levels. Also, https://en.wikipedia.org/wiki/Electricity_sector_in_Finland https://en.wikipedia.org/wiki/Electricity_sector_in_Finland says coal+oil+gas make up only 5.5% of electricity production in Finland last year. Hydro is 16.3%, wind 14.1%, and nuclear 29.6%. Wind production also doesn't lose by staying online. This reactor, which just went online this month, once in full operation, "will supply about 14% of Finland's energy at 1,650 megawatts" - https://en.mercopress.com/2023/05/22/finland-connects-nuclear-plant-to-power-grid-eu-classifies-nuclear-as-sustainable-energy https://en.mercopress.com/2023/05/22/finland-connects-nuclea... . I'm guessing the slowdown was done in part to keep the other generation plans from losing even more money.