3 ms·
Yeah these buildings don’t have bulkheads or risers for plumbing every office. And the entire central air system has to be reworked. If it’s a concrete and stee
by throwaway173738 3y ago
Yeah these buildings don’t have bulkheads or risers for plumbing every office. And the entire central air system has to be reworked. If it’s a concrete and steel building this is going to be a monumental undertaking to cut each floor up and run metal for every one of these changes.