3 ms·
I think a huge part of that is getting things up to code because of zoning rules (eg minimum size of apartment, installing kitchens and bathrooms which requires
by vlovich123 3y ago
I think a huge part of that is getting things up to code because of zoning rules (eg minimum size of apartment, installing kitchens and bathrooms which requires adding plumbing that doesn’t exist, etc etc).
- throwaway173738 3y agoYeah these buildings don’t have bulkheads or risers for plumbing every office. And the entire central air system has to be reworked. If it’s a concrete and steel building this is going to be a monumental undertaking to cut each floor up and run metal for every one of these changes.