3 ms·
In my past roles user stories become problematic when you groom and break stuff down. One of the things that I think happens too often is this desire to get eve
by duncan-donuts 3y ago
In my past roles user stories become problematic when you groom and break stuff down. One of the things that I think happens too often is this desire to get every unit of work down to some maximum threshold. In doing so teams start making weird decisions on what the boundaries of something should be and they lose all context on why they’re doing it at all. I think teams should be given the space to say a unit of work is large and complex and something taking a bit of time to work out is ok.