3 ms·
One exception is the Integral Fast Reactor, which was near production-ready when Clinton cancelled the program in 1994. GE-Hitachi has a similar design called t
by DennisP 15y ago
One exception is the Integral Fast Reactor, which was near production-ready when Clinton cancelled the program in 1994. GE-Hitachi has a similar design called the PRISM which has been approved by the NRC for a full-scale demo reactor. GE is trying to sell it to the UK to burn up their plutonium stockpiles.
In the IFR tests at Argonne, researchers cut off the cooling system entirely, and the reactor just quietly shut down, with no damage.
A great new book on the IFR is Plentiful Energy by Till and Chang, two senior scientists at the Argonne project.