3 ms·
It sounds like you’re expecting ideal operating conditions indefinitely?
by thuuuomas 3y ago
It sounds like you’re expecting ideal operating conditions indefinitely?
- credit_guy 3y agoNo. But I have a hope that the US engineers can do at least as well as the Russian ones. Russia has been running BN-600 for more than 4 decades now, and BN-800 for 8 years. There were incidents but not huge. Here's what wikipedia has to say [1] In the first 15 years of operation, there have been 12 incidents involving sodium/water interactions from tube breaks in the steam generators, a sodium-air oxidation/"fire" from a leak in an auxiliary system, and a sodium "fire" from a leak in a secondary coolant loop while shut down. All these incidents were classified at the lowest level on the International Nuclear Event Scale, and none of the events prevented restarting operation of the facility after repairs. As of 1997, there had been 27 sodium leaks, 14 of which resulted in sodium-air oxidations/"fires". The steam generators are separated in modules so they can be repaired without shutting down the reactor. As of 2020, the cumulative "energy Availability factor" calculated up to year 2019 and recorded by the IAEA was 75.6%. [1] https://en.wikipedia.org/wiki/BN-600_reactor https://en.wikipedia.org/wiki/BN-600_reactor
- robocat 3y agoIt sounds like you don’t understand that engineering is compromises. As soon as you involve radiation, you have some severe compromises to make, and the choices of elements you can use are limited. Sodium is not chosen because of its dangers. Sodium was chosen despite the dangers, because the engineers very very carefully looked at other options and the other options were worse for the needs of their design. https://xkcd.com/793/ https://xkcd.com/793/ and http://johnsalvatier.org/blog/2017/reality-has-a-surprising-amount-of-detail http://johnsalvatier.org/blog/2017/reality-has-a-surprising-... seem relevant. Something as seemingly safe as water can be as dangerous as molten Sodium. The following is an explanation of the Chernobyl accident, which in part was due to using water as a coolant: Efforts to increase the power to the level originally planned for the test were frustrated by a combination of xenon poisoning, reduced coolant void and graphite cooldown. Many of the control rods were withdrawn to compensate for these effects, resulting in a violation of the minimum operating reactivity margin (ORM, see Positive void coefficient section in the information page on RBMK Reactors) by 01:00 – although the operators may not have known this. At 01:03, the reactor was stabilised at about 200 MWt and it was decided that the test would be carried out at this power level. Calculations performed after the accident showed that the ORM at 01:22:30 was equal to eight manual control rods. The minimum permissible ORM stipulated in the operating procedures was 15 rods. The test commenced at 01:23:04; the turbine stop valves were closed and the four pumps powered by the slowing turbine started to run down. The slower flowrate, together with the entry to the core of slightly warmer feedwater, may have caused boiling (void formation) at the bottom of the core. This, along with xenon burnout, could have resulted in a runaway increase in power. An alternative view is that the power excursion was triggered by the insertion of the control rods after the scram button was pressed (at 01:23:40). At 01:23:43, the power excursion rate emergency protection system signals came on and power exceeded 530 MWt and continued to rise. Fuel elements ruptured, leading to increased steam generation, which in turn further increased power owing to the large positive void coefficient. Damage to even three or four fuel assemblies would have been enough to lead to the destruction of the reactor. The rupture of several fuel channels increased the pressure in the reactor to the extent that the 1000t reactor support plate became detached, consequently jamming the control rods, which were only halfway down by that time. As the channel pipes began to rupture, mass steam generation occurred as a result of depressurisation of the reactor cooling circuit. Two explosions were reported, the first being the initial steam explosion, followed two or three seconds later by a second explosion, possibly from the build-up of hydrogen due to zirconium-steam reactions. https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/appendices/chernobyl-accident-appendix-1-sequence-of-events.aspx https://world-nuclear.org/information-library/safety-and-sec...