3 ms·
I'm generally right in the middle of said paperwork, and you've got it right. The main caveat is that overage cost is often (though not always) higher than the
by nknight 15y ago
I'm generally right in the middle of said paperwork, and you've got it right. The main caveat is that overage cost is often (though not always) higher than the commit.
(The other caveat is I've never seen $1/mbps transit, if you find it, let me know. :))