3 ms·
Lead power electronics engineer: "for the projected lifetime failure rate of x as targeted the maximum power should be y" Lead battery engineer: "for the proje
by jnsaff2 3y ago
Lead power electronics engineer: "for the projected lifetime failure rate of x as targeted the maximum power should be y"
Lead battery engineer: "for the projected lifetime cycles the maximum current drawn from the battery should be z"
Lead marketing dude: "so we market it as 2 * y, 2 * lifetime cycles and try to upsell on power" mumbling to themself: "I get my bonus on sales, the recall or warranty claims are not my problem anymore, I'll be partying with the bransons"