4 ms·
Is the relationship between the FAA and space companies really as hostile as people allude to?
by 7373737373 3y ago
Is the relationship between the FAA and space companies really as hostile as people allude to?
- yabones 3y agoI can't speak on the relationship between FAA & Spacex, but I can't imagine it's great considering the public statements that have been made (ie. Twitter). But, FAA takes safety incredibly seriously. Range safety is top priority, and a malfunction of flight termination gear would be a showstopper. If there is indeed a serious design problem with their FTS it would ground the vehicle for a lot longer than the 1-2 months they're claiming for next test flight.
- krisoft 3y ago> it would ground the vehicle for a lot longer This is what Elon is quoted to be saying. [1] "The longest item on that [requirements to next launch] is probably requalification of the flight termination system" > the 1-2 months they're claiming for next test flight Do you have a source for that claim? 1: https://tlpnetwork.com/news/2023/04/starship-ift-postlaunch-update https://tlpnetwork.com/news/2023/04/starship-ift-postlaunch-...
- s1artibartfast 3y agoElon sated 2 months the day of the launch and again in the interview discussed in this thread. https://www.youtube.com/watch?v=mmIqSPux3FY https://www.youtube.com/watch?v=mmIqSPux3FY
- krisoft 3y agoThank you for your response! (And you have such an excellent user name!) I don't want to sound like a stickler but I'm not hearing him claim 1-2 months for the next test flight. That is the specific thing I'm asking about. I even downloaded the subtitles and was reading through it. Are you maybe confused about this part? "I think from a technique from a rocket standpoint and Pad standpoint we are probably ready to launch in uh six to eight weeks" Or maybe this one "and hopefully be ready to fly again in a couple months uh once again". That's not a claim that in 1-2 months they will fly again. That is a hope that in a few months they will be able. A "couple months" can be very well more than 2, and a hope is not a promise.
- s1artibartfast 3y agoThanks! Those were the parts I was talking about and I agree it is far from a firm claim or commitment. Even "plans" are subject to uncertainty. If I recall correctly, There was also a bit where he talked about expectations/aspirations for 4-5 launches this year.
- s1artibartfast 3y agoPS, where does krisoft come from? It sounds familiar?
- krisoft 3y agoAh. Thank you for asking. It is a very mundane thing. Literally my name (Krisztian) + soft for software. :) I choose it when I was very young as a "brand" for the programs I was writing.
- s1artibartfast 3y agoMakes sense, thanks!