Nuclear plants plants "change gears" at 3-5% of their nameplate capacity. https://www.oecd-nea.org/upload/docs/application/pdf/2021-12/technical_and_economic_as
by illiarian 3y ago
Nuclear plants plants "change gears" at 3-5% of their nameplate capacity. https://www.oecd-nea.org/upload/docs/application/pdf/2021-12/technical_and_economic_aspects_of_load_following_with_nuclear_power_plants.pdf https://www.oecd-nea.org/upload/docs/application/pdf/2021-12...
- ragebol 3y agoBut is that enough? How fast does demand rise and drop on an average and a bad day?
- illiarian 3y agoThere are graphs in the report.
- Schroedingersat 3y agoBut they don't because even operating as often as they are able, the french fleet makes a massive loss.