I’ve seen lots of cases where I or others can do better work than “the pros”. Some of it is because we’re working for ourselves on our own stuff and care more.
by allenrb 3y ago
I’ve seen lots of cases where I or others can do better work than “the pros”. Some of it is because we’re working for ourselves on our own stuff and care more. But a lot of it is speed. It’s very possible to do a great job if being slow doesn’t mean you and your family get to starve.
- greedo 3y agoYou're 100% correct about the time factor. I finished my 900 sqft basement including electrical. Everything was perfect, and the inspector was kind of blown away. The reason was because I took 2 years to do the whole basement, and if I spent a weekend doing just one circuit, that was fine. A pro would never be able to spend that much time.
- dylan604 3y agoEven in my experience of doing all of the wiring for the studio, it only took a couple of weeks. By the end of it, I had started to get the hang of what type of bend the conduit would need, and how to measure so the bend would be exactly where it was supposed to be without having to cut some straight pieces to couple the "oops". So the speed would have come naturally just like with any other newbie gaining experience. Doing it "right" doesn't mean doing it slowly, nor does going slow guarantee correctness.
- inferiorhuman 3y agoYep. I'm in that situation right now, finishing up with a kitchen rebuild (water damage). I'm livid with the GC for the mediocre quality of the work and his audacity to consistently lie to my face even about trivial things (e.g. about written communication or insisting a 20A circuit needs a 20A receptacle). The quality of the work though… it's not that I could do better, it's that I've done better at specific tasks e.g. when they R&R'd a ceiling fixture I'd installed. We would've parted ways a long time ago if they'd done things right the first time. Instead I'm slowly going over their work to make sure I don't get screwed even more.