2 ms·
Future of Tunnelling (2019)
- ggm 4y agoAlways disappointed me how many TBMs wind up entombed, because extraction adds too much cost and complexity. At 150m long that's a lot of machinery for a one time project. The lack of certainty to forward conditions was surprising. I assumed ground penetrative radar was doing things here but the article implies not.