3 ms·
break through at several strategic points where the building meets the foundation and place hydraulic jacks in the voids. Once enough jacks are in place and lif
by cuttysnark 3y ago
break through at several strategic points where the building meets the foundation and place hydraulic jacks in the voids. Once enough jacks are in place and lifted, _they_ now serve as the support; the remaining parts of the building can be removed/disconnected from the original foundation.
- n1b0m 3y agoThanks for the explanation. This is on a much smaller scale but shows what you’ve described: https://youtu.be/Qnr5v0farM0 https://youtu.be/Qnr5v0farM0