4 ms·
Well, the analysis at the engineering level was correct. Problem is, the engineers weren't allowed to confirm it. That was a management decision, made on the gr
by ncphil 3y ago
Well, the analysis at the engineering level was correct. Problem is, the engineers weren't allowed to confirm it. That was a management decision, made on the grounds that, "There's nothing we can do".