3 ms·
The North-South interconnects are already happening. The Western HVDC became operational in 2019[1], and two separate Eastern HVDC links (Eastern Green Link 1 &
by Reason077 4y ago
The North-South interconnects are already happening. The Western HVDC became operational in 2019[1], and two separate Eastern HVDC links (Eastern Green Link 1 & 2) are pretty far along in the planning process, with EGL1 expected to begin construction this year and EGL2 in 2025[2].
[1] https://en.wikipedia.org/wiki/Western_HVDC_Link https://en.wikipedia.org/wiki/Western_HVDC_Link
[2] https://en.wikipedia.org/wiki/Eastern_HVDC https://en.wikipedia.org/wiki/Eastern_HVDC