3 ms·
That map shows ALBA-1 (which lands in two places in Cuba, neither Guantanamo, and connects to Jamacia and Venezuela), which opened in 2012. Since then another c
by ta1243 4y ago
That map shows ALBA-1 (which lands in two places in Cuba, neither Guantanamo, and connects to Jamacia and Venezuela), which opened in 2012. Since then another cable - ARIMO - opens this year and connects Cuba to Martinique [0]
The two cables into Guantanamo -- GTMO-PR (opened 2019) and GTMO-1 (2016), after that map opened.
[0] https://www.submarinenetworks.com/en/systems/brazil-us/arimao/orange-and-etecsa-to-build-arimao-subsea-cable-to-cuba https://www.submarinenetworks.com/en/systems/brazil-us/arima...