4 ms·
Even if the job was incredibly small and predictable, my point is that he would likely not be prepared to sign off an open ended project with an uncapped budget
by benjaminwootton 4y ago
Even if the job was incredibly small and predictable, my point is that he would likely not be prepared to sign off an open ended project with an uncapped budget.
- hgsgm 4y agoThat's why he should sign off on a capped budget for an incremental milestone.