I'm surprised Toronto was so low. I've read reports that for 3 years in a row the city has had the most active construction cranes of any north American city.
by chollida1 4y ago
I'm surprised Toronto was so low. I've read reports that for 3 years in a row the city has had the most active construction cranes of any north American city.
I guess it could be that alot of Toronto's buildings don't hit the sky scraper designation?
- InitialLastName 4y agoWouldn't that statistic hold if Toronto were building the normal number of skyscrapers, but were particularly slow about it? If a city starts 1 building/year and buildings take 5 years to build, the steady-state average will be 5 simultaneous active construction sites. On the other hand, if it takes 10 years to build a building, there will be 10 simultaneous active sites.
- Kon-Peki 4y agoThe more likely explanation is that the author has excluded everything less than 100 meters in height. That's somewhere between 30 and 35 floors. You'll be using a "permanent" construction crane for anything greater than 10 or 12 floors - a lot of buildings that use a crane are simply not being counted. FYI - in high-rise construction, the foundation is designed to have a space for the construction crane. It is anchored to the foundation at the beginning of the project and removed at the end. IE, for the duration of the project the crane is part of the building. Shorter buildings will have a "portable" crane, even if it is on-site for a long period of time.
- arecurrence 4y agoI scrolled through and didn't see anywhere that they defined what "complete" meant. It could be as simple as Canada counts a skyscraper as completed when the first residents move in versus perhaps America counts it as completed when the roof is done. This may initially sound dumb... but it can mean a lot "legally speaking". My understanding is Canada and America have very similar building codes and construction plans. Indeed, many of these construction companies are multinational.