3 ms·
BWXT to manufacture BWRX-300 reactor vessel
- PaulHoule 4y agoNote that this machine https://nuclear.gepower.com/build-a-plant/products/nuclear-power-plants-overview/bwrx-300 https://nuclear.gepower.com/build-a-plant/products/nuclear-p... Has been coming on strong recently. It competes w/ NuScale and China’s ACP100 but claims to have economic advantages over the “PWR-with-steam-generators-integrated-in-the-pressure-vessel” because it outright eliminates parts like the steam generator and circulation pump (circulates w/ natural convection under all conditions.) GE has sat out the last round of advanced reactor builds because utilities lost interest in the promising ESBWR, we need to see if the design wins they’ve gotten for this new reactor translate into actual builds and successful operation.