3 ms·
To echo thoughtpalette (we were 2/4 onshore FE leads) - There was a lot of miscommunication between Accenture and Hertz in terms of requirements and sizing up t
by halfmatthalfcat 4y ago
To echo thoughtpalette (we were 2/4 onshore FE leads) - There was a lot of miscommunication between Accenture and Hertz in terms of requirements and sizing up the existing architecture. There were a lot of bad assumptions made, inadequate experience with the chosen FE stack and inexperienced offshore developers. Was an absolute clusterfuck.