2 ms·
I think building new subsea power transmission is cheaper per mile than building over land. If you need to upgrade most of the links along the way, then buildi
by londons_explore 4y ago
I think building new subsea power transmission is cheaper per mile than building over land.
If you need to upgrade most of the links along the way, then building the longest possible cable at sea makes sense.
There might also be plans to tap off this cable to feed into portugal, spain, france and ireland along the way - that allows the cable to also take the role of some of the local transmission grid